TRACK RECORD OF CONTRACTOR PERFORMANCE OF SIMILAR JOBS TO OPERATORS IN OIL &GAS AND NON-OIL & GAS INDUSTRY
S/N | SERVICES RENDERED BY JACIO ENVIRONMENTAL LIMITED (JEL) AND ITS
PRINCIPAL |
JOB TYPE | CLIENT | NAME OF JACIO ENVIRONMENTAL LIMITED CONSULTANT | DATE | STATUS OFPROJECT |
1 | CORPERATE TECHNICAL SERVICES FOR SPDC EAST AND WEST LOCATIONS | CRUDE AND GAS MONITORING/ANALYSIS | SHELL PETROLEUM DEVELOPMENT COMPANY (SPDC) | ALL JELCONSULTANTS | 2023 | On-going |
2 | ENVIRONMENTAL SOCIO IMPACT ASSESSMENT FOR DON DOMINGO WATER COMPANY | ESIA | AQUA EARTH CONSULTING | ALL JELCONSULTANTS | 2023 | On-going |
3 | ENVIRONMENTAL EVALUATION STUDIES AT AIDA ENERGY
LIMITED |
EES | AQUA EARTH CONSULTING | ALL JELCONSULTANTS | 2023 | On-going |
4 | ENVIRONMENTAL IMPACT ASSESSTMENT FOR NEROCITY OIL AND
GAS COMPANY LIMITED |
EIA | AQUA EARTH CONSULTING | ALL JELCONSULTANTS | 2023 | On-going |
5 | ENVIRONMENTAL EVALUATION STUDIES OF WASTE MANAGEMENT FACILITY
AT KOKO,WARRI NORTH |
EES | AQUA EARTH CONSULTING | ALL JELCONSULTANTS | 2023 | Completed |
6 | REMEDIATION OF 10” DELIVERY LINE AT UKUGBA, EGBEMA, IMO STATE. | REMEDIATION | NNPC LIMITED(OML 20) | ALL JELCONSULTANTS | 2023 | Completed |
7 | ENVIRONMENTAL EVALUATION REPORT OF FUEL FILLING
STATION, BENIN CITY |
EER | RUMEL OIL AND GAS LIMITED | ALL JELCONSULTANTS | 2023 | Completed |
8 | ENVIRONMENTAL IMPACT ASSESSMENT OF STARZ GAS LIMITED AT
UTOROGU |
EIA | AQUA EARTH CONSULTING | ALL JELCONSULTANTS | 2023 | Completed |
9 | ENVIRONMENTAL IMPACT ASSESSMENT AT BENDEL GLASS | EIA | BENDEL GLASS | ALL JELCONSULTANTS | 2023 | Completed |
10 | ENVIRONMENTAL ASSESSMENT AT STANCH
FERTILIZER,AKWA IBOM |
EA | STANCH FERTILIZER | ALL JELCONSULTANTS | 2023 | Completed |
11 | ENVIRONMENTAL IMPACT ASSESSMENT OF KURI FIELD DEVELOPMENT,
MAKARABA COMMUNITY |
EIA | AQUA EARTH CONSULTING | ALL JELCONSULTANTS | 2023 | Completed |
12 | POST CLEAN UP INSPECTION OF 16” UZERE-ERIEMU T/L | PCI | FAVOUR WEALTH GLOBAL SERVICES NIGERIA LIMITED | ALL JELCONSULTANTS | 2023 | Completed |
13 | POST IMPACT ASSESSMENT AT KOKO, WARRI NORTH. | PIA | ZAMSON GLOBAL RESOURCES | ALL JELCONSULTANTS | 2023 | Completed |
14 | SEA WATER PROJECT FOR CAPTIVE POWER PLANT AT AKWA IBOM | SEA WATER ANALYSIS | KWALE GENCO FREE ZONE ESTABLISHMENT(KGFZE) | ALL JELCONSULTANTS | 2023 | Completed |
15 | ENVIRONMENTAL
EVALUATION STUDIES AT EGBOLOM, RIVER STATE |
EES | AQUA EARTH CONSULTING | ALL JEL
CONSULTANTS |
2022 | Completed |
16 | POTABILITY TEST ON A DRILLED
INDUSTRIAL BOREHOLE |
POTABILITY TEST | GREEN ENERGY NIGERIA LIMITED | ALL JEL
CONSULTANTS |
2022 | Completed |
17 | ENVIRONMENTAL
IMPACT ASSESSMENT FOR A PROPOSED GAS PLANT |
EIA | NIPCO PLC | ALL JEL
CONSULTANTS |
2022 | Completed |
18 | ENVIRONMENTAL EVALUATION
REPORT FOR OKE-OKHUAINE, EDO STATE |
EER | ENFORT MULTI BUSINESS CONCEPT LIMITED | ALL JELCONSULTANTS | 2022 | Completed |
19 | ENVIRONMENTAL IMPACT ASSESSMENT | EIA | AQUA EARTH CONSULTING | ALL JEL CONSULTANTS | 2022 | Completed |
20 | DESANDING ANALYSIS KOKORI BOUNDWALL | DESANDING | HERITAGE ENERGY OPERATION SERVICES LIMITED | ALL JEL CONSULTANTS | 2022 | Completed |
20 | ENVIRONMENTAL
EVALUATION STUDIES AT ASASA WEST FIELD |
EES | AQUA EARTH CONSULTING | ALL JEL
CONSULTANTS |
2022 | Completed |
21 | ENVIRONMENTAL EVALUATION STUDIES AT SHALLON OFFSHORE, AKWA-
IBOM FIELD |
EES | AQUA EARTH CONSULTING | ALL JEL CONSULTANTS | 2022 | Completed |
22 | DESANDING ANALYSIS | DESANDING | TEJIRUONA-AFOR
NIGERIA ENTERPRISE |
ALL JEL CONSULTANT | 2022 | Completed |
23 | ENVIRONMENTAL MANAGEMENT PLAN FOR ERROSION CONTROL AND ROAD REHABILITATION AT
OWERRI, IMO STATE |
EMP | TURPTINE
GLOBAL SERVICES |
ALL JEL CONSULTANT | 2022 | Completed |
24 | ENVIRONMENTAL MONITORING OF SEA WATER | EM | STANCH FERTILIZER | ALL JEL CONSULTANT | 2022 | On-going |
25 | ENVIRONMENTAL COMPLIANCE
MONITORING AT UGBOLU ASABA |
ECM | AQUA EARTH CONSULTING | ALL JEL CONSULTANTS | 2022 | Completed |
26 | POST CLEANUP INSPECTION AT 41’ ALONG AFIESERE | PCI | ALLIED MODEL PETROLEUM SERVICESLIMITED | ALL JEL CONSULTANTS | 2022 | Completed |
27 | POST CLEANUP INSPECTION AT 20; UPS DELIVERY LINE | PCI | OVITHOPI GLOBAL
LIMITED |
ALL
JEL CONSULTANTS |
2022 | Completed |
28 | ENVIRONMENTAL IMPACT ASSESSMENT OF PROPOSED LPG PLANT | EIA | MATRIX ENERGY LIMITED | ALL JEL CONSULTANT | 2022 | Completed |
29 | POST CLEANUP
INSPECTION AT 4’ FLOWLINE UNERNURHEN |
PCI | KENYO NIGERIA LIMITED | ALL JEL CONSULTANTS | 2022 | Completed |
30 | FACILITY ASSESMENT OF EBENDO PRODUCED WATER | ASSESSMENT | CHRISTHOUSTON NIGERIA LIMITED | ALL JEL CONSULTANT | 2022 | Completed |
31 | EVALUTION, TREATMENT AND DISPOSAL OF OIL SLUDGE | CRUDE OIL ANALYSIS | EBENCO GLOBAL LINE LIMITED | ALL JEL CONSULTANT | 2022 | Completed |
32 | EFFLUENT ANALYSIS | QAQC | SEARCH GATE | ALL JEL CONSULTANT | 2022 | Completed |
33 | CERTIFICATION ANALYSIS AT EKEREMO, WARRI | CERTIFICATION ANALYSIS | NIGERIAN PETROLUEM DEVELOPMENT COMPANY | ALL JEL CONSULTATNT | 2022 | Completed |
34 | POST CLEANUP INSPECTION AT ISOKO DEEP | PCI | NPDC/FHN/OML 26 AMT | ALL JEL CONSULTANTS | 2022 | Completed |
35 | POST CLEANUP INSPECTION AT KM8’ | PCI | NPDC/FHN/OML 26 AMT | ALL JEL CONSULTANTS | 2022 | Completed |
36 | POST CLEANUP INSPECTION AT OWELOGBHO ROAD 16’ | PCI | NPDC/FHN/OML 26 AMT | ALL JEL CONSULTANTS | 2022 | Completed |
37 | ENVIRONMENTAL COMPLIANCE MONITORING OF EGWA FLOW STATION | ECM | ILENESA INTERNATIONAL LIMITED | ALL JEL CONSULTANT | 2022 | On-going |
38 | ENVIRONMENTAL MONITORING OF SEA WATER | EM | STANCH FERTILIZER | ALL JEL CONSULTANT | 2022 | On-going |
39 | CERTIFICATION ANALYSIS AT OUT- JEREMI FLOW AREA | CERTIFICATION ANALYSIS | NIGERIAN PETROLUEM DEVELOPMENT COMPANY | ALL JEL CONSULTATNT | 2022 | Completed |
40 | TEST FOR TOTAL NITROGEN | NITROGEN TEST | SURE HERITAGE | ALL JEL CONSULTANTS | 2022 | Completed |
41 | POST CLEANUP INSPECTION AT IYEDE, DELTA STATE | PCI | JOHNCENO NIGERIA LIMITED | ALL JEL CONSULTANTS | 2022 | Completed |
42 | POST CLEANUP INSPECTION AT EKAKPRAMRE, DELTA STATE | PCI | KENYO NIGERIA LIMITED | ALL JEL CONSULTANTS | 2022 | Completed |
43 | POST CLEANUP INSPECTION AT AMUKPE INTEGRETED FLOWSTATION | PCI | SEPLAT PETROLEUM | ALL JEL CONSULTANTS | 2022 | Completed |
44 | ENVIRONMENTAL AUDIT | EA | RESOURCES IMPROVEMENT AND MANUFACTING COMPANY | ALL JEL CONSULTANT | 2022 | Completed |
45 | POST CLEANUP INSPECTION AT 24’ UPS SAPELE LINE | PCI | AXFLO OIL AND GAS LIMITED | ALL JEL CONSULTANT | 2022 | Completed |
46 | POST CLEANUP INSPECTION AT SAPELE-OKPE | PCI | SEPLAT PETROLEUM | ALL JEL CONSULTANTS | 2022 | Completed |
47 | ENVIRONMENTAL EVALUATION REPORT FOR FUEL STATION | EER | RAINOIL NIGERIA LIMITED | ALL JEL CONSULTANTS | 2022 | Completed |
48 | WATER POTABILITY TEST | POTABILITY TEST | NPDC/FHN/OML 26 AMT | ALL JEL CONSULTANTS | 2022 | Completed |
49 | ENVIRONMENTAL EVALUATION STUDIES AT
IFIEKPORO, DELTA STATE |
EES | AQUA EARTH CONSULTING | ALL JEL CONSULTANTS | 2022 | Completed |
50 | ASSESSMENT STUDY FOR 16’ NUN RIVER FLOWLINE AT AGUOBIRI | ASSESSMENT | SYDNEY GATEWAY LIMITED | ALL JEL CONSULTANT | 2022 | Completed |
51 | QUALITY CONTROL TEST ON CRUDE FOR HQ LOGISTIC COMMAND OGUARA | CRUDE OIL ANALYSIS | ISILAT 5HM OIL AND GAS ENTERPRISE | ALL JEL CONSULTANT | 2022 | Completed |
52 | ASSESSMENT STUDY FOR OPUKUSHI W24T FLOWLINE AT EGBEMAGALABIRI-AGBIDIAMA | ASSESSMENT | SYDNEY GATEWAY LIMITED | ALL JEL CONSULTANT | 2022 | Completed |
53 | ASSESSMENT STUDY FOR 4’ FLOWLINE AT YOKRI | ASSESSMENT | SYDNEY GATEWAY LIMITED | ALL JEL CONSULTANT | 2022 | Completed |
54 | ASSESSMENT STUDY FOR 6’ W12IT FLOWLINE AT YOUBITE | ASSESSMENT | SYDNEY GATEWAY LIMITED | ALL JEL CONSULTANT | 2022 | Completed |
55 | POST CLEANUP INSPECTION AT ENWE COMMUNITY | PCI | AXFLO OIL AND GAS LIMITED | ALL JEL CONSULTANT | 2022 | Completed |
56 | ENVIRONMENTAL COMPLIANCE
MONITORING AT UGBOLU ASABA |
ECM | AQUA EARTH CONSULTING | ALL JEL CONSULTANTS | 2022 | Completed |
57 | POST CLEANUP INSPECTION AT OMAVWEVWE | PCI | HERITAGE ENERGY OPERATION SERVICES LIMITED | ALL JEL CONSULTANT | 2022 | Completed |
58 | QUALITY CONTROL TEST ON CRUDE FOR IFIE TANK FARM | CRUDE OIL ANALYSIS | EBENCO NIGERIA LIMITED | ALL JEL CONSULTANT | 2022 | Completed |
59 | ENVIRONMENTAL IMPACT ASSESSMENT OF PROPOSED UYIM ROAD CONSTRUCTION | EIA | TURPENTING GLOBAL SERVICES LTD | ALL JEL CONSULTANT | 2022 | Completed |
60 | ENVIRONMENTAL MONITORING OF NIGER RIVER | MONITORING | SEEPCO | ALL JEL CONSULTANTS | 2022 | Completed |
61 | PHYSIOCHEMICAL ASSESSMENT OF COOLING WATER | ASSESSMENT | AMBAH | ALL JEL CONSULTANT | 2022 | Completed |
62 | ENVIRONMENTAL COMPLIANCE
MONITORING FOR OGBELE FLOW STATION |
ECM | AQUA EARTH CONSULTING | ALL JEL CONSULTANTS | 2022 | Completed |
63 | ENVIRONMENTAL EVALUATION STUDIES FOR OKWORI FIELD | EES | ETINA ENVIRONMENTAL SERVICES | ALL JEL CONSULTANTS | 2021 | Completed |
64 | ENVIRONMENTAL MONITORING OF NIGER RIVER | MONITORING | DEEP ENERGY | ALL JEL CONSULTANTS | 2021 | Completed |
65 | ENVIRONMENTAL MONITORING OF NIGER RIVER | MONITORING | SEEPCO | ALL JEL CONSULTANTS | 2021 | Completed |
66 | POST CLEANUP INSPECTION FOR YEYE FLOW STATION | PCI | HERITAGE ENERGY OPERATION SERVICES LIMITED | ALL JEL CONSULTANTS | 2021 | Completed |
67 | ENVIRONMENTAL IMPACT ASSESSMENT SECOND SEASON | EIA | EXCALIBUR MAGNET NIGERIA LIMITED | ALL JEL CONSULTANT | 2021 | Completed |
68 | QUALITY CONTROL TEST ON CRUDE FOR OML 30 | CRUDE OIL ANALYSIS | HERITAGE ENERGY OPERATION SERVICES LIMITED | ALL JEL CONSULTANT | 2021 | Completed |
69 | ENVIRONMENTAL IMPACT ASSESSMENT SECOND
SEASON |
EIA | (AMBAH) NEW CROSS PETROLEUM | ALL JEL CONSULTANTS | 2021 | Completed |
70 | CLEANUP AND RECOVERY OF SPILL AT THE
FLOWSTATION AND BURROW PIT |
CLEANUP AND RECOVERY | NPDC/FHN/OML 26 AMT | ALL JEL CONSULTANTS | 2021 | Completed |
71 | CLEANUP OF SPILL AT KM 14 OGINI-ERIMU DL,ERAWHA AT ISOKO
NORTH, DELTA STATE |
CLEANUPOF SPILL | NPDC/FHN/OML 26 AMT | ALL JEL CONSULTANTS | 2021 | Completed |
72 | ENVIRONMENTAL IMPACT ASSESSMENT
FIRST SEASON |
EIA | (AMBAH) NEW CROSS PETROLEUM | ALL JEL CONSULTANTS | 2021 | Completed |
73 | ENVIRONMENTAL IMPACT ASSESSMENT FOR HI DEVELOPMENT PROJECT | EIA | SHELL | ALL JEL CONSULTANTS | 2021 | Completed |
74 | CLEANUP AND REMEDIATION OF
HYDROCARBON IMPACTED SITE ALONG 24” UPS- RAPELE TFPL AT NIGERCAT |
CLEANUPAND REMEDIATION | HERITAGE ENERGY
OPERATION SERVICES LIMITED |
ALL JEL CONSULTANTS | 2020 | Completed |
75 | ENVIRONMENTAL MANGEMENT PLAN OF FORCADOS TERMINAL | EMP | COMPACT MANIFORD
&ENERGY SERVICES (CMES) |
ALL JEL CONSULTANTS | 2020 | Completed |
76 | ENVIRONMENTAL EVALUATION STUDIES AMUKPE FIELD 2020 | EES | SEPLAT PETROLEUM | ALL JEL CONSULTANTS | 2020 | Completed |
77 | BIOMONITORING OF TREATED PRODUCED WATER OF OML 42 UGO-OCHA TERMINAL, ODIDI AND JONES CREEK FLOWSTATION | BIOMONITORING EXERCISE | NPDC/NECONDA/OML 42 AMT | AFRUITFUL ENVIRONMEN T LIMITED/JEL CONSULTANTS | 2020 | Completed |
78 | CRUDE OIL RECOVERY AND CLEANUP AT IGBONINE GRAMMAR SCHOOL PREMISES OZORO | CLEANUP | NPDC/FHN/OML 26 AMT | ALL JEL CONSULTANTS | 2019 | Completed |
79 | ENVIRONMENTAL
COMPLIANCE MONITORING OF Jones Creek |
ECM | NPDC/NECONDA/OML 42 AMT | ALL JEL CONSULTANTS | 2019 | Completed |
80 | ENVIRONMENTAL
COMPLIANCE MONITORING OF GASEOUS POLLUTANTS DISCHARGES FOR DRILLING OPERATION AT OGINI WELL |
ECM | NPDC/FHN/OML 26 AMT | ALL JEL CONSULTANTS | 2019 | Completed |
81 | ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR COMPRESSED NATURAL GAS PLANT | EIA | UD Integrated Petroleum Production Company Limited | JEL LABORATORY | 2019 | Completed |
82 | RECOVERY AND EVACUATION OF CRUDE OIL AT KM 26 OGINI- ERIEMU D/L SPILL SITE TO OGINI
FLOWSTATION |
CRUDE RECOVERY | NPDC/FHN/OML 26 AMT | ALL JEL CONSULTANTS | 2019 | Completed |
83 | RECOVERY AND EVACUATION OF CRUDE OIL AT KM 26 OGINI- ERIEMU D/L SPILL SITE TO OGINI FLOWSTATION | CRUDE RECOVERY | NPDC/FHN/OML 26 AMT | ALL JEL CONSULTANTS | 2019 | Completed |
84 | CLEANUP AND REMEDIATION OF CRUDE OIL ATKM 26 OGINI- ERIEMU D/L SPILL SITE AT AGBARO-OTOR | CLEANUPAN D
REMEDIATIO N |
NPDC/FHN/OML 26 AMT | ALL JEL CONSULTANTS | 2019 | Completed |
85 | ENVIRONMENTAL
COMPLIANCE MONITORING OF ESCRAVOS, OTUMARA AND SAGARA (SHELL) |
EC M | MICHHARRY AND
COMPANY NIGERIALIMITED |
ALL JEL CONSULTANTS | 2018 | Completed |
86 | ENVIRONMENTAL STUDIES SERVICES OGUNU
HELIPADAND ENVIRON (SHELL) |
EES | MICHHARRYAND
COMPANY NIGERIALIMITED |
ALL JEL CONSULTANTS | 2018 | Completed |
87 | Third Party Environmental Audit on state of Impacted site within OML 30 TFP Swampy area(30 Communities) | EA | HERITAGE ENERGY OPERATIO NAL SERVICES LIMITED COMPANY | ALL JEL CONSULTANTS | 2018 | Completed |
88 | Third Party Environmental Audit on state of Impacted site within OML 30 Land area (80Communities) | EA | HERITAGEENERGY OPERATIO NAL SERVICES
LIMITED COMPANY |
ALL JEL CONSULTANTS | 2018 | Completed |
89 | Cleanup of Spill behind the compressor station at Ogini Flowstation | Cleanup | NPDC/FHN/OML 26 AMT | ALL JEL CONSULTANTS | 2018 | Completed |
90 | Cleanup of SpillAlong Isoko Deep-Ogini Bulkline ROW | Cleanup | NPDC/FH N/OML 26AMT | ALL JEL CONSULTANTS | 2018 | Completed |
91 | Remediation of Hydrocarbon Impacted area along ups- Sapele 24” Pipeline | Remediation | EarthProservices Ltd | JEL LABORATORY | 2018 | Completed |
92 | Remediation of Hydrocarbon Impacted area at Evwreni | Remediation | Will-Awogand Son’sNig. Ltd | JEL LABORATORY | 2018 | Completed |
93 | Cleanup of Hydrocarbon Impacted Area Along 28” TFP ROW At Otegele | Cleanup | HERITAGEENERGY OPERATIONAL SERVICES
LIMITED COMPANY |
ALL JEL CONSULTANTS | 2018 | Completed |
94 | ENVIRONMENTAL EVALUATION STUDIES FOR OGUNU RECYCLE
WASTE DEPOT |
EES | SHELL | JEL LABORATORY | 2018 | Completed |
95 | ENVIRONMENTAL EVALUATION STUDIES FOR GBARAN | EES | SHELL | JEL LABORATORY | 2018 | Completed |
96 | ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR AWARITSE FREE TRADE ZONE | EIA | ODUN ENVIRONMENTAL LIMITED | JEL LABORATORY | 2017 | Completed |
97 | ENVIRONMENTAL IMPACT ASSESSMENT (EIA) FOR REVALIDATION OF BASELINE DATA OF ASSA NORTH GAS PROJECT (SHELL) | EIA | AMBAH PROJECT INTERNAT IONAL LIMITED | JEL LABORATORY | 2017 | Completed |
98 | WATER POTABILITY TEST OF NPDC FACILITY AND ENVIRON AT OGUNU WARRI | POTABILITY TEST | ND WESTERN | ALL JEL CONSULTANTS | 2017 | Completed |
99 | GEOTECHNICAL INVESTIGATION OF SAND SEARCH ACTIVITIES AT BOMADI, DELTA STATE | SAND SEARCH | PYDON NIGERIA LIMITED | ALL JEL CONSULTANTS | 2017 | Completed |
100 | WATER POTABILITY TEST OF NPDC FACILITY AND ENVIRON AT EDJEBA WARRI | POTABILITY TEST | ND WESTERN | ALL JEL CONSULTANTS | 2017 | Completed |
101 | MANDATORY IMPACT MITIGATION MONITORING OF DRILLING WELLS | ECM | EVERLINK TELISAT NETWORK LIMITED | ALL JEL CONSULTANTS | 2017 | Completed |
102 | ENVIRONMENTAL COMPLIANCE MONITORING(ECM) OF KOKORI FLOW STATION, DELTA STATE | ECM | EVERLINK TELISAT NETWORK LIMITED | JEL LABORATORY | 2017 | Completed |
103 | ENVIRONMENTAL IMPACT ASSESSMENT (EIA) | EIA | AIMARANCE INTERNATIONAL LIMITED (LPG PLANT) | ALL JEL CONSULTANTS | 2017 | Completed |
104 | ENVIRONMENTAL IMPACT ASSESSMENT (EIA) | ECM | OZENIX INTEGRATED LIMITED (LPG PLANT) | ALL JEL CONSULTANTS | 2017 | Completed |
105 | ENVIRONMENTAL IMPACT ASSESSMENT (EIA) | EIA | JOBUFET OIL AND GAS LIMITED (LPG PLANT) | ALL JEL CONSULTANTS | 2017 | Completed |
106 | ENVIRONMENTAL IMPACT ASSESSMENT (EIA) | EIA | RODEL-ZUWA VENTURES LIMITED (LPG PLANT) | ALL JEL CONSULTANTS | 2017 | Completed |
107 | ENVIRONMENTAL EVALUATION STUDIES | EER | NEWBRIDGE CONTINENTAL | CONSULTANTS | 2016 | Completed |
108 | ENVIRONMENTAL AUDIT REPORT AT OPTIMAL TANK FARM, KOKO, DELTA STATE. | EA | BARCLAY EXPERTS INTERNATIONAL LIMITED | ALL JEL CONSULTANTS | 2016 | Completed |
109 | MANDATORY ENVIRONMENTAL COMPLIANCE MONITORING OF GASEOUS POLLUTANTS AND EFFLUENT DISCHARGE | ECM | EVERLINK TELISAT NETWORK LIMITED | JEL LABORATORY | 2015 | Completed |
110 | ENVIRONMENTAL MONITORING OF GASEOUS POLLUTANTS AND EFFLUENT DISCHARGE AT OREDO FLOW STATION,NPDC | ECM | EVERLINK TELISAT NETWORK LIMITED | ALL JEL CONSULTANTS | 2015 | Completed |
111 | PROVISION OF OIL SPILL CONTAINMENT EQUIPMENT AND CLEAN UP SERVICES FOR ASARAMATORU | Prime Exploration and Production Limited | ALL JEL CONSULTANTS | 2013 | Completed | |
112 | Clean-Up Of Oil Spill Site Along 10” Irri-Kwale Pipeline At Ofagbe | Nigerian Agip Oil Company (NAOC) | ALL JEL CONSULTANTS | 2011 | Completed | |
113 | Disposal Of Expired Contratherm Chemicals | Cameron- Port Harcourt | ALL JEL CONSULTANTS | 2010 | Completed | |
114 | Treatment And Disposal Of Expired Chemical Wastes | Cameron- Port Harcourt | ALL JEL CONSULTANTS | 2010 | Completed |